Dredging operations of existing harbor channel for Sh. Lhaimagu Harbor is ongoing

Dredging operations of existing harbor channel for Sh. Lhaimagu Harbor is ongoing, with 61% completion. The installation of blocks required for quay wall construction and quay wall concrete works are also ongoing.
The Sh. Lhaimagu Harbour project consists of; dredging and excavation operations of 31,000cbm; construction of a 350m breakwater; a 276m quay wall; a 500m revetment; installation of 1,380sqm pavement, installation of navigation lights and streetlights. The value of the project is MVR 53.1 million.