29 Sep Installation of Sea Out Fall (Through Revetment at MIV)
MTCC started work on this project on 4th August 2018. This project, awarded by MWSC, was completed on 7th February 2019. The scope of the project included: Removal of existing breakwater 8m Pre-casting concrete anchor blocks as per the drawing 8 nos Placing of concrete the anchor blocks nos Profiling...