Road Development Project of Ha. Hoarafushi was handed over to MTCC by Ministry of National Planning, Housing and Infrastructure on 8th April 2021. COO Shahid Hussain Moosa signed on behalf of MTCC and Ms. Zeeniya Ahmed Hameed, Permanent Secretary signed on behalf of MNPHI. Scope of of...

Channel and maintenance dredging of Ha. Baarah was handed over to MTCC by Ministry of National Planning, Housing and Infrastructure. Scope of the project includes Channel dredging operations of 79,100cbm Existing basin maintenance dredging of 8,600 Supply and installation of navigational aids The value of the project...

Land Reclamation of N. Velidhoo boat beaching area was handed over to MTCC by Ministry of National Planning, Housing and Infrastructure. Scope of works for the project include Land reclamation operations of 3.48 hectares Levelling 138,247sqm of reclaimed area Construction of 255m revetment The value of the...

Maldives Transport and Contracting Company, MTCC has signed with Ministry of National Planning, Housing and Infrastructure towards implementing shore protection project at Ha. Hoarafushi. The agreement relating to the project was signed by CEO Adam Azim signed on behalf of MTCC and Director General Ms. Fathimath...

We have mobilized Sh. Lhaimagu Harbour project site on 07th December 2020. Work on Design and Build of Sh. Lhaimagu Harbour is well underway. New harbor basin dredging works for the project is currently ongoing, with 50% completion. Scope of the project includes Dredging and excavation operations...

Construction of Breakwater in S.Feydhoo was handed over to MTCC by Ministry of National Planning, Housing and Infrastructure on 4th October 2020. Scope of the project includes Construction of Submerged rock breakwater 125m The value of the project is MVR 1.8 million.  ...

Work to design and build Design and Build of Harbor in ADh. Mandhoo is underway. The work for this project was awarded by the Ministry of Housing and Infrastructure to MTCC on 10th December 2019. Work carried out under this project includes: Dredging & Excavation of 24,598cbm Construction of 25m groynes Construction...

Harbour Dredging works of GA. Villingili was handed over to MTCC by Ministry of National Planning, Housing and Infrastructure on 9th September 2020. Ga. Villingili Harbour dredging works is well underway, with overall 50% project progress. Scope of the project included Dredging of Existing Harbour Basin &...

The project to construct the harbor of AA Himandhoo to modern standards was handed over to Maldives Transport and Contracting Company, MTCC by Ministry of National Planning, Housing, and Infrastructure in April 2019. Scope of the project included Conducting dredging and excavation works of 28,030-cubic-meter Construction of a 372-meter quay wall Construction of a 405-meter breakwater Construction...

Work on Design and Build of R. Rasmaadhoo Harbour is underway. Scope of the project includes Dredging and excavation operations of 9,000cbm construction of a 377m breakwater construction of 600sqm of paved area installation of navigation lights and streetlights The estimated value of the project is MVR...