Design and Build of Sh.Komandoo Harbor Upgrade was awarded to MTCC by Ministry of National Planning, Housing and Infrastructure on 4th August 2019 Scope of the project includes Channel Dredging 14,731cbm Maintenance & New harbor basin  Dredging35,348cbm  Developing 12m Breakwater Developing 20m Revetment 20m Developing 190m Quay wall Developing 1,991sqm...

Design and Build of Sh. Foakaidhoo Harbour Upgrade was awarded to MTCC by Ministry of National Planning, Housing and Infrastructure on 29th December 2019 Scope of the project includes Dredging and excavation 45,795cbm Development of 507m Breakwater Development of 100m Revetment 100m Development of 464m Quay wall Development of 2,320sqm of Pavement ...

Design and Build of Sh. Feydhoo Harbour Upgrade was awarded to MTCC by Ministry of National Planning, Housing and Infrastructure on 29th December 2019 Scope of the project includes Dredging and excavation 27,500cbm  Development of 378m breakwater Development of 90m revetment Development of 276m quay wall Development of 1,380sqm pavement Installation...

Design & Build of Harbour Upgrade in S. Meedhoo was awarded to MTCC by Ministry of National Planning, Housing and Infrastructure on 23rd June 2019 Work on Design and Build of S. Meedhoo Harbour is well underway, with overall 90% project progress. We have completed quay wall construction works. Pavement...

Construction of Bahaudheen Magu at S.Hulhumeedhoo was awarded to MTCC by Ministry of National Planning, Housing and Infrastructure on 27th March 2019 Scope of the project includes Development of stormwater management system Carriageway 17,776sqm Installation of streetlight, road markings, service lines and drainage Paving 6,060sqm sidewalk, crossing pipe and tree...

The Harbor repair and dredging in R.Vandhoo was awarded to MTCC by Ministry of National Planning, Housing and Infrastructure on 26th August 2019  Scope of the project includes Demolition of Existing Cement bag wall structures and depositing the debris   Dredging, Excavation Harbour Basin-  cbm 1,870.00   Quay wall -m 75.00   Precast blocks Delivery nos 38.00   Block...

K. Thilafushi harbour re-development project was awarded to MTCC by Ministry of National Planning, Housing and Infrastructure on 21st November 2019  Scope of the project includes Site clearance and general earthworks Development of concrete carriageway Surface water management Development of administrative building Workshop and Civil works...

Harbor Redevelopment and Reclamation Project K.Dhoonidhoo project was awarded to MTCC by Ministry of National Planning, Housing and Infrastructure on 05th September 2019 The project was mobilized on 21st September 2020. Scope of the project includes Dredging and excavation 4.61 acre Reclamation 3.75 acre  Construction of Breakwater 370m  ...

Design and Build of HDh. Nellaidhoo Harbor Upgrade project was handed over to MTCC by Ministry of National Planning, Housing and Infrastructure on 27th August 2019. Work on Design and Build of Hdh. Nellaidhoo Harbour is well underway, with overall 50% project progress. We have completed installation of precast concrete blocks...

GDh. Maavarulu Harbour Extension project was handed over to MTCC by Ministry of National Planning, Housing and Infrastructure on 16th September 2019.  Work being conducted under the project includes Construction of 199m breakwater Construction of 30m revetment Construction of 50m quay wall Harbour pavement 250sqm Installation of...

The project to re-develop the harbor of Dh. Hulhudheli was handed over to MTCC by Ministry of National Planning, Housing and Infrastructure on 10-12-2019. Work conducted under the project includes Dredging & Excavation 45,585cbm Construction of 60m Groynes  Construction of 432m quay wall   Development of 227m breakwater ...

Sh. Feevah harbor upgrading project was awarded to MTCC on 2nd July 2019 by  the Ministry of National Planning and Infrastructure. This project includes Dredging 23859.73cbm Harbor Basin Dredging 14,743 cbm Channel Area Supplying of L-Blocks (2m width)232 Nos Installation of Anchor blocks to the quay wall...

The construction of M. Veyvah harbour upgrade was awarded to MTCC on 27th August 2019 by  the Ministry of National Planning and Infrastructure. This project includes: Dredging, Excavation of 56,925 cbm new basin  Dredging, Excavation of 3,914cbm new channel Precast blocks delivery, block installation, cast in-situ wall casting  Placing of...

MTCC was awarded the design and construction of V. Rakeedhoo harbour on 1st October 2019. The project was contracted to MTCC by the Ministry of National Planning, Housing and Infrastructure. The project was mobilized on 08th June 2020. Work on Design and Build of V. Rakeedhoo Harbour...

MTCC was awarded to design and construct Th. Guraidhoo harbour on 1st October 2019. The project was contracted to MTCC by the Ministry of National Planning and Infrastructure. The project was mobilized on 19th August 2020. Scope of the project includes Dredging operations of 7,952cbm for a...

MTCC was awarded the construction of N. Miladhoo harbour on 25th September 2019. The project was mobilized on 25th March 2020. The first shipment of rock boulders has been delivered to the project site. The scope of the project includes: Dredging and excavation operations of 37,222cbm; Construction of...

MTCC was awarded the design and construction of L. Maavah harbour on 25th September 2019. The work for this project was contracted to MTCC by the Ministry of National Planning, Housing and Infrastructure. Scope of the project includes Dredging and excavation operations of 26,885cbm Construction of...

Work on Design and Build of R. Rasmaadhoo Harbour is underway. Scope of the project includes Dredging and excavation operations of 9,000cbm construction of a 377m breakwater construction of 600sqm of paved area installation of navigation lights and streetlights The estimated value of the project is MVR...

The construction of of B. Fehendhoo harbour was awarded to MTCC on 2nd July 2019 by  the Ministry of National Planning and Infrastructure. Work on Design and Build of B. Fehendhoo Harbour is well underway, with overall 75% project progress. We have completed quay wall construction...

The construction of L. Maabaidhoo harbour new channel was awarded to MTCC on 4th August 2019 by  the Ministry of National Planning and Infrastructure.   This project includes: Dredging and excavation 12m breakwater 20m revetment 190m quaywall 11m by 11m ramp Interlocking pavements Installation of 10 mooring blocks, 2 navigational masts, 19 harbour lights...

The Construction of H.A. Ihavandhoo harbour was awarded to MTCC on 26th August 2019 by the Ministry of National Planning and Infrastructure.   This project includes: Construction of 284m breakwater 178 revetment 95m quaywall Construction of a ramp . and walkway Construction of a 4581.5 sqm of pavement Installation of 20 mooring blocks,...

The construction of H.Dh. Nehlaidhoo harbour was awarded to MTCC on 27th August 2019 by  the Ministry of National Planning and Infrastructure.   This project includes: 164m breakwater 224 quay wall 125m groyen 33154 cbm harbour deepening 2012sqm pavement 10 mooring blocks 2 navigational lights 20 harbour district lights A harbour ramp  ...

Design and Build of V. Felidhoo Harbour Extension was awarded to MTCC on 5th September 2019 by  the Ministry of National Planning and Infrastructure. Scope of the project included Construction of a 126-meter quay wall Construction of a 61-meter breakwater Construction of a 200m revetment. Construction...

Work on Design and Build of R. Maduvvari South Harbour was awarded to MTCC on 26th August 2019. Director General of Planning Ministry Fathimath Shana Farooq signed on behalf of the government and the CEO of MTCC Hassan Shah, signed on behalf of the company. Scope of...

The construction of H.A. Kelaa harbour (phase 2) was signed between MTCC and the Ministry of National Planning and Infrastructure in 30th July 2019. We successfully completed Phase Two of the harbor construction project in Kelaa, Haa Alif Atoll on 9th July 2020. Scope of the work...

The project to design and build the harbor of B. Fulhadhoo was handed over by Ministry of National Planning, Housing and Infrastructure to MTCC on 02nd July 2019 .  Work being conducted under this project includes Channel Dredging of 29,167.50cbm  Dredging of Harbour basin 22,694cbm development of 108m breakwater ...

The project to construct and develop the main roads at R. Ungoofaaru was handed over to MTCC by Ministry of National Planning, Housing and Infrastructure. The agreement of the project was signed by Director General of Planning Ministry Fathimath Shana Farooq and the CEO of MTCC...

The construction and development of  main roads at L. Fonadhoo was signed on May 22nd, 2019. Director General of Planning Ministry Fathimath Shana Farooq signed on behalf of the government and the CEO of MTCC Hassan Shah, signed on behalf of the company. Under this...

The construction and development of  main roads at B. Eydhafushi was signed between the Permanent Secretary at the Ministry of Planning and Infrastructure, Zeeniya Ahmed Hameed and the COO of MTCC Shahid Hussain Moosa, on April 1st, 2019.   This project includes: 17785 sqm road Installation of storm water management...

The construction of ring road at Gn. Fuvahmulah was signed between the Permanent Secretary at the Ministry of Planning and Infrastructure, Zeeniya Ahmed Hameed and the CEO of MTCC Hassan Shah, on March 27th, 2019. Scope of the project includes Construction and development of 20,650sqm asphalt...

H.Dh. Kulhudhuffushi Shore Protection was awarded to MTCC by Awarded by Ministry of National Planning and Infrastructure. Scope of the Project includes Dredging & Reclamation 29,735-cubic-meters Construction of rock boulder revetment 800-meters Lake fill area 72,067-cubic-meter The project cost is MVR53432377.074.  ...

The construction of the Quaywall at G.A. Kanduhulhudhoo was awarded to MTCC on 27th March 2019. The construction work for this project, awarded by Ministry of Housing and Infrastructure, is currently on-going. Scope of the project includes Construction of 414-meter quay wall Construction of a 40-meter breakwater ...